Yesterday, reporters from the national grid (referred to National Network) has learned that as a 264.4 billion increase in nearly 300 million. Liu Zhenya, general manager of State Grid, the future 5-year State Grid will invest over 500 billion yuan, the high-pressure engineering, Matt, and built a strong power grid.
learned that UHV construction, the Development of UHV is the
2011, the State Grid clear: to ensure that the Huainan (Anhui) - Shanghai UHV approved project in the first quarter, and strive to Ximeng - Nanjing, Huainan (Nanjing) - Shanghai approved the first half of UHV AC works, Mengxi - Changsha , Jingbian - Lianyungang UHV AC works and Xiluodu - western Zhejiang, Hamilton - Henan HVDC projects approved during the year.
By 2015, the State Grid will be referred to as High channel sent to northern, central and eastern China; the southwest of the northern coal and hydropower, high voltage through the three horizontal channels sent to North China, Central China and the Yangtze River Delta region to ensure electricity supply in the country.
time, cross-country network resources capacity will reach 250 million kilowatts, an increase of more than 5 times, greatly to resolve the current tension coal. Liu Zhenya, that the operation of coal recurring tensions, mainly because of excessive dependence on coal energy distribution, and transmission is significantly lower proportion.
reporter learned that,
Moreover, a large western coal, hydropower, nuclear power and to wind power, solar-based renewable energy base is being accelerated construction to form a backbone grid of UHV will be able to adapt to large-scale energy and large clean energy base construction consumptive requirements for delivery to meet the electricity needs of the people.
(reporter Zhang Yan)
No comments:
Post a Comment